News & Events

Burgoyne Bridge

Owner: Ministry of Transportation of Ontario Location: St. Catharines, Ontario, Canada Area: 83,960ft² (7,800m²)

Solution: Erected over two years, the Burgoyne Bridge in the Region of Niagara spans Welland Canal. The 2,830-ton steel superstructure includes Matacryl WPM under vehicular and sidewalk paving to contribute to achieving the bridge's more than 80-year design life. 

 

Key performance features:

  • Available in spray and manually-applied grades to suit job site condition
  •  Installs at a wide range of ambient and substrate temperatures - -4 to 95 °F (-20 to 35 °C) – to extend the construction season
  • Chemically inert; does not require hazmat precautions
    for disposal once cured
  • Rapid cure time promotes fast installation, lower labor costs
    and efficient handover to the next construction phase
  • Cold liquid-applied; no heating or conditioning of resins is required
  • Matacryl systems are only installed by authorized

 

For more information, email: info@fptinfrastructure.com or call: 1-336-789-7259

 

 


news button prev
news button next